Chapter 1458: Two people competing for one


Chapter 1458: Fighting for One

The problem comes again. The Jade Seal Stone itself is a huge rock protruding from the side of the mountain facing the river. It is almost impossible to move it away. Son.

“After careful testing, we decided to implement in-situ protection.”

“In-situ protection? Will it be effective? If there is a big flood, won’t the water have to be poured in? The bottom layer of the village? "

"So we need to build a dike." The old man drew a schematic diagram on the map: "Build a huge dike to surround the bottom of Shibaozhai so that the river cannot flow in. ”

"Hey, if this happens, coming from the Yangtze River in the future, wouldn't Shibaozhai look like a small bonsai floating on the lake?" Zhou Zhi's eyes lit up: "It's interesting..."

Everyone Looking at the drawings and thinking about what it looks like, I feel that the description of thoughtfulness is really apt.

“Except for the nine, ten, and eleven three-story towers, which were newly built in 1956, the topmost Tianzi Hall was built in the Wanli period of the Ming Dynasty, and the lower tower was built in the early Qianlong period. "Rebuild it again in the next year," the old man said. Of course, we adhere to the principle of protecting the country's immovable ground cultural relics. If we can't move them, it's best not to move them. "

"Can this embankment be guaranteed to prevent water seepage?" Lin Wanqiu asked. Care about this.

“The quality of the project must be guaranteed.” Zhou Zhi is not worried about the water seepage problem: “Besides, this is not a difficult process. The Three Gorges Project can even block the Yangtze River, so this project is certainly not a problem. ”

"Of course there are still difficulties." The old man knew that these people who came were all financial backers, and he quickly began to complain: "In addition to the waterproofing of the embankment, there is another difficult place, which is drainage."

"You know When it rains, the water flowing down from the mountains will also Because of the existence of the dike, it is not easy to prevent external drainage and internal drainage in this project. "

Yes, everyone realized that when the basin was built, the water outside would disappear. It can't come in, but how can the water inside be drained out?

“Actually, even without the Three Gorges Project, Shibaozhai is currently facing several problems.” Seeing that everyone began to pay attention to it, the old man introduced it carefully: “The first is the dangerous rocks on the mountain. Long-term weathering has now caused reduce the risk of collapse, Seriously endangering the safety of the tower. "

"The second is the drainage of the mountain. Due to the natural limitations of being built on the mountain and due to disrepair, the drainage channels on both sides of the tower have begun to seep and are in urgent need of repair. ”

"The third is in front of the mountain gate. It has been eroded by the river for many years. Now it has formed a landslide zone and caused a lot of water seepage."

"Is there a cultural protection project plan now?" Li Laosan asked.

“We have a plan.” The old man said: “The first two are easy to handle. There are only two ways to deal with weathered dangerous rocks. One is that if the collapse will affect the building structure, solidify it. , solidify with reinforced concrete; secondly, if it does not affect the construction, smash and remove the drainage on both sides of the tower and in front of the mountain gate. The project also needs to be redesigned and some water-seeking slopes should be paved with waterproof materials, which can solve the problem. "

"The biggest problem is to completely solve the landslide area in front of the mountain gate. The first problem is that we should dig down thirty meters deep on the outer edge of the landslide zone and directly reach the bottom rock layer.”

"Including the 20 meters on the ground, a total of 50 meters high slope embankment belt will be built and solidified. In this area, a cement retaining wall will be built to block the erosion of the river water. This project is a bit big, almost equivalent to a medium-sized Although the dam enclosure project of the hydropower station is not that difficult, there is still an additional earthwork clearing project.

“What do you think? "Li Laosan asked Zhou Zhi. This guy is a bit irresponsible. He is more like an accountant and fund custodian in the foundation.

Of course, this is also related to his unfamiliarity with this aspect of business.< br>
“When doing projects, of course it is better to do it sooner rather than later. " Zhou Zhi said: "But this is a national key cultural protection unit, and the state will make overall arrangements. It is not our foundation's turn to intervene. ”

"Of course, if there is anything that requires the coordination of our private forces." Lin Wanqiu said to the old man: "For example, the early allocation of funds to support the inspection plan, etc., we are also duty-bound."

"There is nothing else. It’s particularly difficult because the plan is finalized and printed..." The old man seemed a little blushing and a little embarrassed to speak.

"Then the foundation will allocate one hundred thousand to you." Zhou Zhi said: "But we have a suggestion."

"You say it, you say it." The cultural protection inspection is the same as the academic inspection. , in the end, it is about forming academic results. With this money, this result can be known to more people and have a greater impact. Of course, the old man is very happy.

“Our opinion is that since the Shibaozhai Cultural Preservation Project mainly depends on the state, the state may have more specific considerations, and there may be situations where it is beyond its capabilities at this stage.” Zhou Zhi Said: "So for this project plan, I think we should develop three plans: upper, middle and lower, that is, three situations: tight funds, reasonable funds, and sufficient funds."

"The plan you just mentioned is obviously the best choice when funds are abundant, but if the country thinks the cost is too high and refuses to approve it, won't this matter be delayed?"

"Therefore. We think there should be three solutions, to ensure that the three are competing for one, and at the same time, we must ensure the sustainability and non-duplication in the future. It’s a waste. I want to report it to this level, and the effect will be better.”

The Three Gorges Project is a project that involves all aspects and is completed with the efforts of the whole country. It is very important to separate the cultural protection work. , but when viewed within the many problems that urgently need to be solved in the Three Gorges Project, it is a bit inadequate.

When you are unable to do what you want, the normal logical thinking is to solve the most urgent tasks first. Things that are not enough to see often have to be moved to the back.

Of course Zhou Zhi is not willing to be pushed back because of this idea, causing huge losses to national cultural relics, so he has this suggestion, that is, no matter how much money we have or how little we have, we should work as hard as we can. It's better to apply for a big project and be killed directly, resulting in nothing being accomplished.

The old man is a scholar seconded from the Hubei Provincial Institute of Cultural Relics. His main responsibility is to use his professional knowledge to inspect the cultural preservation work of Shibaozhai, and submit the inspection report and cultural preservation plan suggestions to the Yuzhou Cultural Relics Bureau. He doesn’t understand the system very well. , I am actually a little confused about the underlying logic of Zhou Zhi’s suggestion.

However, although he did not understand the twists and turns, it was obvious that Zhou Zhou’s suggestion was more detailed and more feasible than his original idea. For the sake of the 100,000 yuan allocation, the old man followed the good advice. : "Okay, then we will make a plan according to this suggestion!"

(End of this chapter)

Previous Details Next