Chapter 653 Preparation


Chapter 653 Preparation


Today, the most important group in Principality Wusen is scholars, engineers, and technicians. Merchants must be slightly behind.


If a person has a doctorate degree, a senior engineer titles or an orange technician certificate, his honor in society is no less honored than a baron.


Now that Grand Duke of Wanson is crazy, these people are crazy.


The large conference room of the Weson Zhou government is full of seats. The banner on the wall reads "The Tyrum Chrysanthemum Classification Ship Design Format Conference and Construction Mobilization Conference and the Founding of the Shipbuilding Committee".


On the podium, the high -level high -level gold content of the Yaru chrysanthemum -class shipbuilding committee is extremely high. The chairman is Pachel. In the business of industrial mouths, the vice president of Wesonburg University, Manu, was responsible for coordinating various research institutions. The Minister of Executive Frok was responsible for coordinating the relevant authorities and logistical support. The chief of the Chundian Arsenal Factory Bruce was responsible for coordinating weapons.


Today, Pseaken wearing a dark blue blacksmith, throwing a loud saying on the podium: "Our goal, within six months, build two versatile chrysanthemum -level armed merchant ships at the same time."


"In the next work, we need to node upside -down work period, promote the stubble, carefully and accurately promote the pace of construction, and go all out to win the" 180 -day battle "!"









"

No one can see in everyone here. In order to optimize the existing immature design, she continued to work in the design room of the shipyard for six days and nights, and worked at the production office for three days and three nights.


She did not talk nonsense, so that people issued the planning of various factories and departments, discussed on the spot, asked questions on the spot, and solved the problem on the spot.


The name of the Yaru chrysanthemum -class general ship comes from the voting of the shipyard. This type of ship has a displacement of 600 tons and a length of 60 meters. It is equipped with 4 150 horsepower low -speed steam engines. Cargo ships, warships and armed merchant ships are designed between 16 and 22 kilometers per hour.


Because it is necessary to navigate non -supply no supply, the number of engines is increased to reduce the chance of damage at the same time, increase the volume of the supply product warehouse to carry more supplies, so that the tonnage has increased from 500 tons of the original plan to 600 tons. As a result, the engine horsepower has increased. Essence


Posick personally shot to calculate the overall structure in the shortest time, and then decompose the construction process and exclusivity period. Some of the technical departments are still lacking in the relevant departments to study and formulate alternatives.


The plan is six months, but after deducting a month of sea test time, the actual construction time is only five months.


If there is a year, many problems will not exist. Now, when you are in a hurry, the problem of how to improve the speed of work will appear.


The head of the shipyard factory Bochner first asked: "We need to add at least 20 welders to welding the keel. If there are 30 to 40 people, it can shorten 20 %."


Manu Er said immediately: "I will recruit qualified young people in school. If the shipyard can promise to give priority to those who perform well, I guess it can recruit more."


Welding technicians are all fire magicians. Excellent technicians are not low. They are also the backbone of factories that cannot be released. It is best to recruit in school.


If you can work in a high -income shipyard, there must be many people applying.


Bokner said: "In the future, this type of ship will be produced in large quantities, and we need a lot of welders. This is okay."


"The second problem is ship wood, because of the influence of the Northern War, the decrease in merchant ships from the dark land, and the supply of wood is a bit tense."


Generally, it can be used for wooden boards, but this is the boat that Frederick is going to take. No one dares to carry it. It is best to use it.


What solved this problem was Lilu: "Please give me the list before and after, I will arrange at the Dawn Chamber of Commerce to purchase urgently."


Bokner immediately took the list from the briefcase, let the staff hand it over, and said: "The number of high -power riveting machines for fixed shipboards is insufficient, and a group of short -distance walkie -talkie is needed to coordinate riveting work." "I will arrange the factory to work overtime."


The problem that the shipyard urgently needs to solve is these, and what problems will be followed in the work will follow up.


Secondly, the transportation problems between several factories, large parts such as keel, steam engine, axis, etc. need train transportation, whether the railway department arranges a special line.


Especially in the smelting plant and forging plant, the refined metal ingots should be transported to the forging factory for forging components such as keel. The two places are not far from the railway, but without their own trains, they have temporarily found the railway sector to transport them temporarily.


"I will coordinate a number of freight trains with the Ministry of Railways for this conference battle with the Ministry of Railways.

Representatives of the railway department attending the meeting said that the special committee will set up a special committee to dock with various factories.


One by one proposed one by one, and one by one.


This time the conference did not arrange media interviews, nor had it been proactively mentioned to the media.


However, many people found that the relevant factories were suddenly busy. Shipyard, smelting factories, forging factories, heavy machinery factories, glass factories, screw factories, hemp rope factories, etc. The atmosphere of these factories became particularly nervous. How many days are there, even meals are stuffed, and go to the workshop after stuffing.


The shipyard set up a model of the same size with wooden racks and canvas. Lilu took the sailors to simulate daily work and meet at sea. Essence


There is no mistake, one, one, one, one, one, one, one, one 619, one book, one, one, one, one, one, one, a book!


The situation of this travel is a bit special. In addition to the sailors, the sailors also need to bring the army, doctors, priests and goods, weapons, ammunition, and a lot of food, so the cabin is relatively compact.


Because there are many non -sailors traveling, in order to alleviate the fatigue of the long -term maritime sailing, a entertainment room also arranged on the ship, including a table tennis table, and iron board and iron -absorbing chess pieces.


In the end, the ship was temporarily changed to some designs, and the mast was hit extra.


Frederick is going to act with the boat. In case two ships have a total of eight steam engines, all of them fail. No one dares to bet on this situation. It also becomes necessary.


Because of this, the spies that smell the smell of all countries thought that the shipyard wanted to create a traditional sailboat and didn't care.


Some people judge that many factories of the Principality of Weisen suddenly worked overtime to produce military equipment for expanding the army.


There is a feather pen militaryman even wrote in newspapers, thinking that the number of Weisen Army's army is insufficient and it is difficult to deal with various threats. Therefore, it is likely to establish a Bohemian division in the form of foreign legions and mercenaries.


More spies rushed to the city of Boyiham to find out the reason why Grand Duke of Weson invested in the Bohemia region.


Some people have been inquiring about the recent brows.


(End of this chapter)


Previous Details Next