Chapter 58 Dockyard, CA Mortar
Corner Building Hotel.
After everyone had eaten and drank enough, Yu Yang regarded the three rows of large tile-roofed houses in the township compound as the offices of three major construction engineering companies.
Then according to the factory planning map, arrange the areas for which they are responsible.
A brick kiln was built nearby.
The second construction was to the north of Yujia Village.
Near Sanjian Expressway.
Projects include: construction of drainage channels, installation of utility poles, and laying of track bed.
"This project does not involve contracting fees or procurement of building materials. It only needs to be constructed in strict accordance with standards, and everyone can get money."
"But if anyone does something wrong with me, such as secretly reselling Sanyuan Agriculture's cables, telephone poles, etc., I think that other than me, the old director will not let him go."
The expressions of the executives of the three major companies, who were already frightened by the bandits' behavior, changed again.
At most, Yu Sanyuan made everyone suffer, but if it were Lao Dong, the next three generations would suffer.
"Okay, let's get started!"
Yu Yang waved his hand and walked out of the corner building.
The mayor, deputy mayor, and director of the investment promotion office who were waiting outside quickly gathered around.
The three major construction engineering companies of Taishi Road and Bridge Group are far higher than Shiliying.
The company managers sitting inside were all leaders and senior officials in the eyes of the three people in the township compound.
There are so many high-ranking officials coming here with more than 2,000 people. If we don't communicate well in advance, given the current atmosphere of Shili Camp, it is estimated that there will be trouble soon.
For example, villagers touch a few wrenches and steal a few tires.
For example, when a construction worker passes by a village, he grabs a few chickens and takes a few dogs with him.
Don't look at it as a trivial matter, but this is how many big conflicts accumulate.
And once there is a big conflict, and there are so many people on both sides, it is inevitable that there will be casualties.
The mayor took out the soft-box Huaxia that came from Xiaoyanglou and handed one over, "How do you like it?"
"It's done. They are all very obedient, especially the third city construction company. They are expected to stay with us."
"Good thing!"
"Furthermore, I asked for funding for the parking lot and secondary road."
"How many?"
"25 million."
"hiss……"
This amount of money is an astronomical figure for Shiliying, whose fiscal revenue has never exceeded 1 million.
The township chief worried: "It's just that the old director has passed this allocation, will it be reduced by half?"
Yu Yang was slightly startled.
Yes, this is the money transferred by the old director himself. How much will be left in our account?
At this moment, the former business manager of the county branch and now the deputy president of the county branch called.
"The boss, the Second City Construction and the Third City Construction, remitted 10 million and 15 million to me respectively, please note your name."
"The amount is correct."
"This money?"
"Keep it in the account first, don't move it arbitrarily, and don't take advantage of the lack of loan facilities in various banks to take advantage of the interest difference."
"Okay, don't worry about this."
Yu Yang hung up the phone and fell into deep thought.
for a long time.
He saw many machines arriving at the factory one after another, as well as many company executives giving orders...
Yu Yang understood.
Although Mr. Dong is greedy for money, his achievements are equally important.
With the attitude of the old Dong who spent money like crazy and attracted the three main players of Taishi Road and Bridge Group, he probably planned to use Sanyuan Agriculture as the basis for promotion.
This has advantages and disadvantages for the family.
The good thing is that my future situation in Tai City will be green.
The downside is that the closer the family gets to the old Dong, the more likely it is that they will be liquidated in the future.
So what about large agricultural companies? Trillion-dollar real estate giants are just going to collapse.
Fortunately, the future is too long-term. At worst, Sanyuan Agriculture will go bankrupt midway, and the old director will be severely cheated.
Yu Yang stamped out his cigarette butts and looked at the mayor, "Thief Dong is still very good to us."
"No deduction?"
"It's a lot of money."
"Did that person take the wrong medicine?"
"Since you are following Thief Dong, try to say as little as possible like this in the future."
"Oh, yes, but why can you call Dong Thief?"
"I stick to my heart."
The three people in the township compound collectively pouted.
The mayor asked again, "This money?"
"When the storm passes, we will tear out the bridge holes on the highway and rebuild them."
"It's been several years. It's better not to rush for a while, but to strengthen three-dimensional agriculture."
"It has almost been enhanced. Now more and more vegetable sellers are coming to wholesale the bean sprouts. Although the bean sprouts are not heavy, they take up a lot of space. In order to run a long distance, the vegetable sellers always want to haul more, and the carriages are stacked one above the other. high.
The bridge is narrow and low, and there is already a traffic jam. When we invest in 30 plastic greenhouses again, the number of customers will increase, and getting in and out of Shiliying will become a big problem. "
The township head nodded, "I don't know if the superiors agree with the reconstruction." "There is an old Dong who wrote the materials and approved them himself."
"yes!"
Everyone was stunned.
The expressway in Tai City is indeed in charge of Lao Dong.
"Furthermore, in the future, you should be bolder in doing things. Just like today, you can connect with the three major construction engineering companies. You can join them."
"In a room full of leaders, how can we do it?"
"What's wrong with the leader? Haven't you ever heard of the seventh-rank official in front of the prime minister? Behind you is Lao Dong. You are a direct descendant of Lao Dong. You are a true direct descendant who has never been deducted from the funds allocated. You are afraid of a ball."
"That makes sense!"
The trio also realized.
At this time.
The mayor saw the chairman of the city's first construction and thought that the other person was always putting on airs, and immediately turned cold and said, "Humph!"
The latter originally planned to approach Yu Yang and voluntarily hand over the management rights and the 20 million allocation for the construction of residential buildings. Faced with this scene, he broke out in a cold sweat and did not dare to step forward.
Seeing that the effect was good, the township chief raised his head and chest and walked towards the grain station.
The deputy township chief and the director of the investment promotion office did not imitate the township chief. Instead, they glared fiercely at them to encourage them, and then they also walked towards the grain store.
Muleng, the chairman of the Municipal First Construction Company, was on the spot.
As for Yu Yang.
Gone long ago.
…
The participation of the three major construction engineering companies suddenly accelerated the construction speed of Sanyuan Agriculture by more than ten times.
Just like drainage channels, in the past, thousands of people were required to dig trenches side by side, and then build the dug-out soil into ditch banks so that the drainage channels could accommodate more water flow.
Now you only need to mount a large triangular bucket on a large tractor, run directly there, plow it into a V-shaped ditch, and then use the second mounted equipment to consolidate the dug-out soil, and it can be done directly, which can be said to be done in one step.
There are also track subgrade construction, electric pole drilling and expansion cast-in-place pile construction...
The application of various mechanical equipment and the high-standard quality requirements of state-owned enterprises mean that Yu Yang, a person who has worked as a general contractor, can find no faults at all.
Immediately I realized that the old director was able to achieve his current status not only because of his efficiency, but also because of the ability of his subordinates.
However, compared to the future, the building materials and construction techniques in the current time and space lag far behind.
For example, if you lay your own rails, you must use track beds and sleepers.
However, Shiliying had difficulty purchasing gravel, let alone pine wood.
To this end, three major construction companies have developed a steel-concrete slab roadbed for the track.
There is no need to lay sand and gravel for cushioning, and there is no need to lay sleepers. The prepared steel-concrete beams are directly used to replace the old design and are used to support electric locomotives.
This seems fine, but there are gaps in the rail joints. Even if an electric locomotive is used, the rails will vibrate and then crack the steel-concrete roadbed, causing an accident.
Yu Yang recalled the construction plan he received when contracting for a high-speed railway section in another time and space, as well as some of the parameters and features provided.
So I came to the township compound and summoned all materials personnel from the three major companies to discuss it.
"I once heard a technician talk about a ballastless track suitable for electric locomotives. The main material is CA mortar."
"It is made of water, cement, fine aggregate, emulsified asphalt, and admixtures in different proportions and mixed through a specific process."
“With certain strength, low elastic modulus, high environmental sensitivity, and stable working performance, it can completely replace sleepers and gravel roadbed in the field of electric motorcycles.”
"And according to the proportion of organic matter, it can also be divided into positive ion type and negative ion type to adapt to different environments."
Chief Technical Engineer: “I don’t know the ratio of these materials?”
"The technician said he forgot."
"..."
"Really, it's not that the technician didn't tell me, it's that he really forgot."
"Without a ratio, we can only experiment, but composite material experiments, from solidification to characteristics, to stability, durability, lifespan, etc., take several months per round, and may take more than a dozen rounds, or even more Hundred rounds of experiments.”
"Let's do it first." Yu Yang couldn't help it, he really forgot.
"Okay, I'll arrange for someone to deliver the materials." The chief technical engineer turned and left.
Yu Yang sat in front of the patchwork conference table, looked out the window, and frowned again to think carefully.
for a long time.
"It seems that I really forgot."
But when he saw the military camp in the distance, his heart moved.
Call up the translucent page and find the dock.
[Basic dock: Fishing boats can be built, but you need to bring your own building materials. ]
Fishing boats: specifications, characteristics, lifespan, affected by building materials...
Yu Yang examined the question seriously, his eyes getting brighter and brighter.
This is not a shipyard, this is a building materials experimental center!
It’s like a ballastless track.
Although we don’t know the ratio of the main material CA mortar, we can mix the raw materials of CA mortar together to make a cement fishing boat.
Then adjust the raw material ratio according to the values displayed by the dock, such as characteristics and lifespan, and finally let the values of the cement fishing boat meet the requirements of the load-bearing track. Isn't this the real CA mortar?
"So..."
Yu Yang turned to look at the DIY blacksmith shop.
The shipyard experiments with CA mortar, and the DIY blacksmith shop makes metal molds.
Then pour the CA mortar into the metal mold. Didn't you make a 'prefabricated version of the ballastless track'?
Centralize production, transport in batches, splice in sections, and finally lay rails and install electric locomotives...
This construction speed may not exceed that of Railway Construction.
"Then can I shout now and be far ahead?"
"This is for high-speed rail only!"
(End of chapter)