After Lu Chuan returned to Haizhou City, his life was very peaceful.
The case in Dongzhou City will not be concluded for a while. Li Donglin and the crime team continued to stay in Dongzhou City for more than ten days and have not returned yet.
The first month has passed in the blink of an eye.
Although Haizhou City is located in the north, spring always comes earlier because it is close to the seaside.
After entering mid-March, the weather has turned warmer and many mountain flowers have bloomed.
Although Lu Chuan returned to the High-tech Zone Branch, he has been paying attention to the cases in Dongzhou City.
After nearly a month, the entire case was basically sorted out.
Relevant evidence for Gao Xiaoguang’s previous ten cases has also been collected.
In fact, this time is already very fast. After all, it may take more than 10 days just to identify the scene of 10 cases.
But the trial of the specific case and subsequent sentencing may take longer.
The main reason is that the hanging time is too long. There are many cases involved and the families of the victims need a certain amount of time to do anything.
It is impossible for Li Donglin and the others to stay stationed in Dongzhou City forever.
After the whole case was sorted out, the serious crime team was disbanded after all the evidence was fixed, and Li Donglin went back to the provincial department to report.
However, now that the case has been solved, the remaining link is the judicial process. The merit report written by Li Donglin has been reported to his superiors.
Li Donglin called Lu Chuan the night before yesterday. After the job request report was sent, someone from the ministry came down to verify and communicate.
There is definitely no chance of winning first-class collective merit. Lu Chuan's title of hero and model is still being discussed over there.
But judging from the information Li Donglin received, it may not be a big problem.
Lu Chuan actually didn't care too much about whether he was promoted or not, but to be honest, Lu Chuan still cared about meritorious service.
Especially the possibility of winning the title of hero model this time, which makes Lu Chuan very excited to be honest.
However, Lu Chuan did not tell his family about this news, and it would not be too late to communicate after everything has settled.
The weather has become warmer since the end of March. During this period, the High-tech Zone Bureau has been relatively quiet, and no major cases have occurred.
Lu Chuan was also happy to calm down and go home to spend time with his wife and children.
The little guy was very lively and peed on Lu Chuan frequently.
The accident happened on March 28.
Spring is blooming and construction projects in Haizhou City have begun one after another.
Dongfeng Road was originally the center of the old city of Haizhou City. Although now because the buildings are relatively old and there are fewer young people living here, many locals are still used to living here.
There is a Dongfeng Drainage behind Middle Road, which was originally a domestic drainage ditch for residents on Dongfeng Road.
But later, because the water was drained into the ground, this water area was slowly abandoned. Although domestic wastewater was no longer discharged, some domestic garbage was also dumped in it.
The entire Dongfeng Aqueduct is about 3 kilometers long. Because no one has cleaned it for a long time, the water gradually became more and more smelly.
In recent years, it has become a smelly ditch, which is basically famous throughout Haizhou City.
In order to create a good living environment, the Haizhou Municipal Government decided last year to start cleaning up and renovating such small domestic water channels in the city.
This year, related municipal projects have already begun, and Dongfeng Water Canal is the first to be cleaned. But the project was stopped after less than three days.
The reason is simple. When the workers were cleaning the sludge and garbage in the pool, they found three woven plastic bags.
It doesn’t matter if it’s an ordinary plastic woven bag.
When we started cleaning the Dongfeng Canal on the first day, we dug out some unknown things from it. Therefore, the excavated garbage will basically not be cleaned up, and will be directly loaded onto the garbage collection truck and transported away.
Originally, these three woven bags were also to be loaded onto garbage trucks and transported directly to the garbage dump.
But the person directing the forklift took a look and realized something was wrong.
Because one of the woven bags was damaged, something inside was sticking out.
From a distance, it looked a bit like an arm, so the person directing the forklift stopped the forklift for a moment and stepped forward to take a closer look. Sure enough, it was true.
After that, the construction company called the police.
People from the local police station immediately blocked the scene after they arrived at the scene, and then because there were three woven bags, each one was very large.
This does not look like a person.
So, the police station did not deal with it rashly, but reported it directly to the High-tech Zone Bureau.
Now Lu Chuan has led the criminal police team to Dongfeng Canal.
The three woven bags are still in the shovel of the forklift. The driver is already being questioned, as are some other construction workers.
“We started the construction three days ago. It was good before. The construction progress is quite fast these days. According to the plan, we should complete the dredging project within this week and then start Treat water bodies.”
The person in charge of the construction is called Wang Hu.
Wang Hu has been engaged in municipal engineering projects for many years. The engineering company he works for has connections with them and gets a lot of municipal projects every year.
Of course, today's municipal projects are much more difficult than before.
Let’s not talk about whether we can get the project. Even if we get the project, the difficulty of the project is not particularly high, but the requirements have increased a lot.
When I was doing projects in the past, the quality requirements were not that high, and the payment was settled faster.
In addition, there are many other tricky things in the project here. For example, a road will be paved this year and the sewer will be repaired next year.
In this case, the road will be dug in the middle, and then the sewers will be built. After the construction is completed, other pipe corridors will be dug the next year.
In short, the main theme is that there is no planning or design, and you can do whatever you want.
There are too many things like a road that has been built for 10 years and 8 years and has become dilapidated every year.
But that’s no longer possible. Municipal engineering requirements are much higher, such as the cleaning of the Dongfeng Canal.
The above only gave one week to complete the cleanup no matter what, and then manage the water body.
There is no problem in cleaning up. It can be completed quickly. As long as some large machinery and some manpower are invested, it will be faster. However, cleaning up water bodies is more difficult.
There is basically no way to clean the original water body. We can only drain it out and then introduce new water bodies. Only in this way can we achieve the effect of beautiful mountains and clear waters.
But now it seems that it is impossible to complete the cleaning work of Dongfeng Canal in one week.
Now the forklift has dug out three woven bags from here. One of the arms is still exposed. No one knows if there are other woven bags. (End of this chapter)