Chapter 226 The turning point is approaching
The chairman of Jiangxin Shipbuilding and his party, and soon got an order to get 30 inland transport ships and 10 marine scattered transport ships from the Logistics Division of Hailufeng Company.
These vessels are electric transport ships.
Among them, in the order of inland transport ships, 10 tons of bulk shipping ships, 10 2000 -ton loose transport ships, 10 5,000 -ton -class loose transport ships.
10 maritime scattered transport ships, 5 tons of 5 tons, and 5 of 20,000 tons.
In addition, Jiangxin Shipbuilding Corporation also develops and produces two battery supply ships.
A battery supply ship used in the river can carry the battery on it, and there is also the adjustment equipment that quickly replace the battery container.
The other is a battery supply ship used in offshore, and the design is similar to the inland one.
The reason why the battery supply ship is designed is mainly worried that the electric transportation ship is insufficient on the way, or there is no way to park the ships at the nearby port.
This is similar to the fuel supply ship.
For the unbroken shipbuilding industry, so many orders can at least make Jiangxin Shipyard for more than half a year.
After all, traditional transport ships are not only low in profits, but also very internal rolls. Among the various types of ship types in the shipbuilding industry, it is more profitable to build a natural gas transport ship.
After Jiang Miao sent away the chess country and his party.
Liu Shanhe, general manager of Nandian Group, visited again, and not only they came together, but also the State Grid, China Merchants International, COSCO Shipping, State Power Investment, Three Gorges Group, Zhongguang Nuclear Nuclear, Huadian Heavy Industry and other companies.
These companies are divided into three types, power grids, port affairs, and power generation.
Obviously, the news of these state -owned enterprises is more spiritual than private enterprises.
In fact, more than a month ago, they received news from Hai Lufeng's development of sponge batteries. This month was not studying the performance of sponge batteries, but it was discussing how to use sponge batteries.
The idea of the grid is to use the sponge battery to regulate the power supply fluctuation.
Hong Kong affairs are biased towards the use of sponge batteries to develop electricity replacement services.
New energy power generation companies are biased towards the use of sponge batteries to regulate the waste of electricity, making it shorter to this cycle.
As a result, after the discussion, Hai Lufeng found that Hai Lufeng was layout in the inland river electric transportation ship and electric change pier. They felt simply cooperated in the Quartet.
Listen to the description of Liu Shanhe and others.
Jiang Miao has no opinion: "I know your thoughts."
Their three ideas are very simple, that is, to transform the port and establish a power station in the port. This power station can realize the peaks of reclamation and selling electricity.
As long as this can be achieved, the overall situation of new energy will be completely revitalized.
Jiang Miao said the plan of Hailufeng Company: "Our company intends to use the method of leased batteries for operation."
"Renting battery?" President Zhao of China Merchants International also heard the leased battery, and asked curiously: "I don't know how to rent the battery?"
Jiang Miao did not hide, and opened the door directly to see the mountain: "Very simple, the full life of a cubic meter of the battery cell, the rent of 10,000 yuan, plus 10,000 yuan in margin."
One of the deputy pens of the State Grid calculated: "The battery life of your company is 600 times ... a single discharge is 400 degrees, and the life span is 240,000 degrees of electricity, 1/24≈0.0416, and the battery cost of once electricity is about four points. Money "
Liu Shanhe shook his head: "Can't calculate this. We can adjust the battery combination to keep the discharge power of a single cells below 60 kW as much as possible. It is 320,000 degrees, and the cost of the one -electric battery is about three -pointers. "
"It makes sense."
"Add infrastructure, electric damage, maintenance and manual, the cost of electricity at a time will increase about six or seven cents."
This cost is within their acceptance.
After all, the core price of the battery core of lithium -phosphate iron batteries is about 33,000 yuan per ton.
How about a good factory from a tonnage of lithium phosphate? The power storage capacity is 160 degrees, which can circulate 2000 ∽3,000 times, calculate by 2,500 times in the unsuccessful cycle, and the electricity stored in the whole life is 400,000 degrees, and the electricity loss is about 10%. That is, the full life discharge is 360,000 degrees.
The cost of the average battery per kWh is about nine cents.
In fact, the cost of this battery must be one moss or even higher.
Coupled with other costs, the cost of a set of power storage systems has reached about one meal of one meal per kilometer.
You know, the current electricity price of the power grid to new energy power generation enterprises has only been as much as four cents, and a power storage system has devoured one -third, or even nearly one -half. Even less.
Take large land wind power as an example.
At present, the comprehensive investment cost of land wind power projects has been rolled up to about 1200∽1,500 yuan per kilowatt capacity.
According to this cost, if you sell 0.45 yuan for a while, the full power power generation is about 2666∽3330 hours, and the investment cost can be recovered.
However, if the supporting power storage system in construction, coupled with daily operating costs and maintenance costs, the cost of each degree of electricity will reach about 0.26 yuan. It happened to encounter a low -grid electricity price. At one time, there was only about one meal of revenue. It could be used to flatten the cost of investment fan and construction. This requires a full power power generation of 1.2 % to 1.25,000 hours to return to the book.
It looks good!
After all, the construction area of the wind power project can be generated for about 3,000 hours per year, which is about 4 ∽ 5 years.
However, reality is cruel.
Because the power generation is not equal to the power of the Internet.
Many times, wind power is generated, but the power grid does not need so much electricity, and the wind power company itself does not have a large power storage system, and it can only waste these electricity.
Ideally, the Lufeng project can be returned in about 10 years.
The more terrible Haifeng project, the comprehensive cost of the aircraft projects of the Haifeng project is 3,000 yuan per kilowatt capacity. Under the ideal state, it takes 20 years to return to the book.
There is also a fatal problem in the sea breeze project, especially the sea breeze project on the southeast coast. Once a typhoon is encountered, the luck may be killed by the typhoon, which further increases the overall cost.
Therefore, the wind power project has become half -dead after the official subsidy in the past few years.
There is no mistake, one, one, one, one, one, one, one, one 619, one book, one, one, one, one, one, one, a book!
The use of sponge batteries can be used to lower the comprehensive cost of about 50%of the battery, and it can also improve the power of the power grid, so as to make full use of the sent out of power.
The bosses of these new energy companies are constantly calculating costs.
In the end, they come to a conclusion that the use of a sponge battery. The Lufeng project can be reduced to about 5 ∽ 6 years. The Haifeng project can be compressed to about 10 ° C. This cycle.
If you are lucky, you will have a stable and efficient power generation that connects for several years, and even these wind power projects can even further compress this cycle.
Compared with the previous period of more than ten years and more than 20 years, they already feel very good.
Although they knew that Hai Lufeng had made a lot of earnings with the sponge battery, they understood that this was a good technology, and they could only pay for their own skills.
Soon these state -owned corporate boss borrowed the office of Hailufeng Company to discuss further cooperation here.
The result of the discussion is to set up two operating companies, which are the southern power storage and the power of the north.
Various new energy companies have taken out the funds at the bottom of the box. Here, by investing in the south and the power of the north, they quickly return to blood.
After discussing the new company that completed the joint venture, the South China Electricity and Power Storage in the north set up a sponge power core lease contract of up to 200,000 cubic meters to Hailufeng Company.
It is planned to build a batch of power stations along the port of coastal areas. After these power stations are built, even if there is no electric ship, there is no electricity to change electricity. You can also earn a lot of money by regulating the power of the power grid every year.
Discussing these things, worked out for more than a week before and after, only planned to hold a press conference in Shamei City.
At this time, Hailufeng's sponge battery finally couldn't hide it.
Not only other state -owned enterprises received news.
Those new energy companies in China have also received news.
The concept stocks related to wind power, photovoltaic, motor, and shipbuilding have soared rapidly, almost a day of daily limit.
The lithium battery concept stocks suddenly plummeted.
Just in this two worlds, the press conference was officially held in the Pinqing Lake Government Affairs Center in Shamei City.
Jiang Miao did not attend, but Lin Shuya and Liu Haitao, the manager of the battery business department, attended on behalf of Hai Lufeng.
At the venue, in addition to the news media at home and abroad, there are many related practitioners of new energy companies, some technical R & D personnel, and corporate boss and enterprise executives.
They are eager to be excited, or frowning, or their heads, and the entire scene is like a dish market.
Jingneng International's Lu Zhenwei was also at the scene. He had cooperated with Jiang Miao a few days ago. The two parties jointly engaged in a battery production company. The management is responsible for the responsibility of Jingneng, and Hailufeng Company only does financial supervision. The company's name is Jingneng Battery Company.
And there is another additional condition, that is, for each cubic meter sponge battery, it is necessary to pay the patent fee of 3,000 yuan to Hailufeng Company.
Although it was eaten by Hailufeng Company 80%of profits, this is an acceptable condition for Jingneng International.
In addition, State Electric Power Investment also established another battery joint venture with Hailufeng Company with the same conditions, the National Electric Battery Company.
The battery company just came to the cooperation between Hai Lufeng Company and Jingneng and State Electricity, which surprised them, and was very annoyed and anxious.
Although Hailufeng Company has not yet entered the core car battery and mobile phone batteries, it is just that the electricity replacement items they have inquired can be rounded to all seaports in China.
But anxiety is useless. Now they can only pray. Hai Lufeng will give them a buffer time, otherwise domestic battery companies will be finished.
(End of this chapter)