"Afterwards, we sorted out the situation and found that the earliest computer room was indeed a double -road power supply, but when the computer room was renovated, because the design was not considered, the zero line of one line could not be connected. In order to solve the problem of power supply, another one will be another one. The zero line of the line is shared with it. "
"This plan was reported verbally at the time and was approved, but it was only approved as a temporary plan. However, because no documents were left, and no urging, termination, and improvement measures were made. The scheme, the drawings still use the old drawings. After the maintenance personnel were connected to the mobile phone room for operation and dimension, they did not carefully perform regular review, testing and drills, which caused this problem Timing bombs "
"Until the ISO group of the four -leaf grass group entered the Blue Sky Sunshine Group to help them sort out the system, plan the process, reserve information, and implement the responsibilities, they will expose many issues."
"At that time, the situation can be described as shocked. We sort out places that do not meet the requirements of the quality system. More than 60 places lacking in the system, more than 70 places lacking in personnel configuration, more than 70 places that are not in place in responsibility, information, information There are countless plans, and the test and verification workflow basically do not exist. Prior to, in the event, afterwards, afterwards, the review, review, and summary basically do not exist. br>
"This situation exists in the company. It is not surprising that the accident is. On the contrary, because the employees are too conscious, they have made up for the shortcomings of the system and management with their own motivation."
"For example, the potential failure of the machine room I just gave an example. In fact, as long as you have strictly controlled the check -in It can be avoided, but it is precisely because people are floating in the matter. A total of dozens of links formulated in total, each of which is the same, which leads to the failure of the fault. "
"This is definitely a matter of management." Zhou Zhi said sincerely: "I don't know if there are similar problems in the base. If so, it should definitely be vigilant. , Five aspects of resources, processes, supervision, and responsibility, establish a modern management system. "
"The determination is actually good." Li Weigang and Zhang Weichao looked at: "In the past few years, there were two accidents, and the base was on the base. It doesn't matter. "
"But to be honest, the method is not scientific." Zhang Weichao said: "Many comrades are overloaded for a long time, and we are also worried that this energy is loose and there will be problems."
"This is the second point I said, the resources of resources." Zhou Zhi said: "In fact, this problem is closely related to thinking."
"For a long time, there is a problem with our enterprises that is to focus on production, light management, and attach importance to the labor of workers, but despise the labor of management, and even the management is equivalent to exploitation, squeezing, and pushing it to the opposite of the labor."
"This also leads to the introduction of many effective, necessary management measures, often not get everyone's understanding."
"Actually, I think that for the two major effective measures to improve labor productivity, one is technology, and the other is management." Zhou Zhi said: "Therefore, if scientific and technological is called the primary productivity, scientific management should be the second. Productivity. "" Increasing the investment in enterprises is now understood by most people. Just go, it is not worthy of excellence as technology. "
Both Li Weigang and Zhang Weichao's hearts were all in their hearts. The last sentence Zhou Zhi said was not their thoughts in their hearts.
"Actually, what I want to say is that the two are very important to the enterprise." Zhou Zhi said: "If it is said that it has formed a shortcoming for the enterprise, it restricts the development of the enterprise, then Hurry up and optimize and make up for it. "
"For example, the comrades you just said have been overload for a long time in order to strengthen quality management, which explains the problem itself." Zhou Zhi said: "It shows that the base is insufficient in quality management and insufficient means, so he can only work with manpower to work with manpower. To fill up the time, then you should find a way in this regard, work hard, introduce excellent management tools, and release manpower again. "
"Blue sky sunshine, what management tools do they use?"
"Previously, it was because the introduction of the ISO quality management system brought a great work burden on the management work of the group." Zhou Zhi laughed: "Therefore, we have to develop a set of procedures to improve work efficiency. This program will bring us us. The office system, the development system is linked, constitutes a complete set of technology company process management systems. The design logic of the system itself is designed to rely on the R & D process of general technology companies, and then the operation of these logical processes will be instructed. The quality management system and the three are organically combined. We have also completed a series of management tasks such as human resource management, workload assessment, process progress control, product quality control, product version management, technical document collection and retrieval, product submission, etc. "
"Later, in the process of helping the Blue Sky Sunshine Group's implementation of the ISO system control, we re -modularized and parameterized tuning this system to separate a set of application scenarios independent of the four -leaf grass group, but even more Professional, the system that can customize modules and processes freely, is called the quality process management system, which is referred to as QPM in English.
"To be honest, if there is no such system, it is impossible for us to complete the ISO system management." Zhou Zhi explained: "The reason is very simple, because the previous four -leaf grass is also a heavy production and no management. Investment does not heavy management input, everyone is saturated in their own production tasks. "
“如果要把管理重视起来的话,那么每个人需要提交的产出物就不再仅限于产品了,需要有一套与ISO体系相符合的附加产出物,以我们的软件开发部分来说,除了Procedures also require design instructions, system architecture instructions, technical development instructions, technical development manuals, system test manuals, functional test manuals, module test manuals, test case manuals, version instructions, version source code, version target code, system verification manual , Functional verification manual, module verification manual, verification case manual.
"Each set of manuals must have three scriptures, reviewing, and archiving for review. The increase in the workload is actually equivalent or even exceeding the development volume." (This chapter is completed)
There is no mistake, one, one, one, one, one, one, one, one 619, one book, one, one, one, one, one, one, a book!