Chapter 133 Town Center


Chapter 133 Town Center
Shiliyingxiang compound, precast concrete component factory.

Along the tracks in the factory and on the west bank of Heping East Lake, tens of thousands of construction workers are working overtime in the site that stretches for several kilometers from south to north.

Some are transporting building materials.

Some are operating large mixing plants.

Some are tying steel bars.

Some are pouring asphalt concrete.

Some are using cutting machines to trim burrs.

Some are cleaning metal molds after use.

Some are also maintaining concrete prefabricated parts...

And on the outside of the venue.

The inspected ballastless track modules are piled up like a mountain, but they are neatly placed on both sides of the track in the factory, and large steel plates are paved at the bottom.

A little bit.

An electric locomotive pushed hundreds of flat track cars and drove slowly.

Five engineering rail cars equipped with small gantry cranes appeared on another track.

When the electric locomotive stopped, five engineering rail cars started small gantry cranes. Then, with the help of construction workers, they hung the lifting ropes on the large steel plates, lifted a large stack of ballastless track modules, and moved them into the flat car.

The operation was extremely fast, with hundreds of carriages completed in just half an hour.

Then, with the sound of whistles and whistles, the train began to accelerate.

Then pass through the Pingdong Lake Plastic Greenhouse Area, pass through the Jiuxianxiang Soybean Industry Area, cross the Xiaoqing River Railway Bridge, then pass through the Feishi Beijiao Soybean Industry Area, and finally arrive at the end of Sanyuan Agriculture Line 1, Tianwaiqiao Station.

At this time.

A strange-looking wheeled engineering vehicle appeared on the parallel track of Tianwaiqiao Station.

The vehicle is 20 meters long. A small gantry crane is also installed at the rear, but the middle area is empty, and a conveyor belt and a drum-style mechanical device are installed at the front end of the vehicle.

The construction workers were working in the wheeled engineering vehicle. The gantry crane connected the large steel plates in the flat rail vehicle and moved a stack of ballastless track modules to the vacant area in the middle of the wheeled engineering vehicle.

Then the wheeled engineering vehicle slowly moved forward along the track and came to the end of Line 1.

At the same time, the construction workers on the vehicle used small cranes to lay the ballastless track modules section by section on the conveyor belt.

The conveyor belt runs and is trimmed and measured with the help of metal baffles, and then the ballastless track modules are fed into the drum equipment.

The drum is turned over, so that the ballastless track module is covered with special adhesive, and then it is tightly attached to the end of Line 1, and then stabilized, leveled, and measured. After passing the test, another section is attached, and another section is attached...

Repeatedly, the wheeled engineering vehicle continued to move forward. In just one minute, the track foundation of Line 1 was extended forward by more than fifty meters.

After the wheeled engineering vehicle passed by, the construction workers on both sides of the track lifted a maintained and processed rail.

Then it is connected to the track of Line 1, and professional tools are used to install connecting parts and high-strength bolts.

After the measurement was completed, the construction workers took out the prefabricated steel components prepared in advance and fixed the rails to the locks reserved at both ends of each ballastless track module.

Hundreds of construction workers, with clear division of labor and skilled operation, completed the 20-meter ballastless track in just three minutes, and then started the next 20-meter...

Three hours later.

The construction workers with high-intensity work got off work on time and were replaced by the second batch of construction workers who were recuperating.

Another three hours later.

The second batch of construction workers got off work and were replaced by the third batch of construction workers...

And the other side.

Fifteen miles to the south, there is also a large construction site.

In this area, muck trucks are rushing endlessly, construction machinery is deafening, and tens of thousands of construction workers are interspersed among them, either cleaning the site, compacting the foundation, digging trenches with soil, drilling holes for pouring, or installing telegraph poles...

Soon, two track roadbeds appeared in front of us, extending towards Pingyang County.

Perhaps it won't be too long before wheeled engineering vehicles will lay the ballastless track modules here.

Tai City, inside the Tianwai Bridge Watchtower.

Old Dong and the city manager took turns raising their large cannon-style telescopes to look at the busy construction site in the distance.

Too fast!
Incredibly fast. But it all happened right under your nose, you have to believe it.

The city manager sighed: "I finally understand why you said that Yu Yang's talent in the field of construction far exceeds that of farming. With this skill, he can make a living even if he does not engage in agriculture."

As if he heard someone praising his own child, Old Dong smiled proudly, but said modestly, "He is still young and has a lot to learn. I originally planned to let him find a university to study for a lesson or two, but he was always rejected. Refuse, alas~~~"

The city manager secretly curled his lips, "Just now did Yu Yang call?"

"Line 1 is open to traffic, and Shiliying's products are about to arrive in Tai City in large quantities. In order to facilitate transshipment, storage, and sales, he urged us to move out of the city compound as soon as possible and start the logistics distribution center project."

"There is nothing wrong with City W. Office supplies, documents and files, etc., have been transported to the hillside of Tianwaiqiao."

"It's true that you have no problem there. You just need to change the office location nearby. But when the city compound moves to Shiliying, there are too many issues to consider, such as where the cadres will live, how to arrange the cadres' families, whether the cadres' children should transfer to another school, and so on. That is, the Shili Camp is more than 100 miles away from Tai City. From now on, when cadres go to the grassroots, fuel, meal supplements, etc. must be planned in advance, otherwise the military will be unmotivated and how to do things well. "

"I just heard Yu Yang say on the phone, is the bulldozer on the train?"

"So what if he gets there? Could it be that he still dares to bulldoze the city compound?"

Old Dong Hun waved his hand nonchalantly, "He works in a hurry. You must endure his temper, otherwise you will suffer big losses in the future."

Before he finished speaking, he looked through the telescope and suddenly saw several familiar figures walking out of Tianwaiqiao Station on Line 1.

It seems to be...the demolition team of the third city construction company?

Then I saw people from the demolition team getting into a pickup truck, crossing two streets and driving directly into the city compound.

Immediately afterwards.

Bulldozers, hammer excavators, and iron ball demolition trucks gathered one after another at the gate of the city compound.

The city manager was condescending and saw this scene without a telescope, "Deputy Manager Dong, if you really have to endure his temper, you can slowly endure it here. I'll go back first."

After that, I got off the observation tower and walked along the newly built stone mountain road of Tianwai Bridge towards the city W plastic greenhouse located on the hillside.

How could Lao Dong be in the mood to upset someone anymore, so he took out his mobile phone and dialed the number.

"What you do makes me lose face more and more!"

"Boss, please read the email. I have prepared an office hall for you that is particularly suitable for your temperament."

The old director was slightly stunned, suppressed his dissatisfaction, climbed down from the observation tower, walked into the Tianwaiqiao restaurant, and asked the office secretary to borrow a computer to receive emails.

The next moment.

A large retro building appears in front of you.

There are three floors in total, with birds and animals flying on the eaves, and rugged blue tiles on the roof, making the whole building majestic.

And there is a plaque hanging on the top of the door: Taishi Courtyard.

Lao Dong lost his temper instantly.

It's not that he likes the tone, but it's the characteristic.

After all, both Dongyue Scenic Area and Shuibo Liangshan are all in ancient architectural style.

If Taishi compound also builds one...

"Very good!"

"Move here tonight and I'll catch the wind for you."

"Xiao Yu, it's not that I don't want to move, but there are many problems that need to be solved in advance."

"What's the problem?"

"For example, when we arrive at Shili Camp, we have to deal with the accommodation of cadres, the placement of cadres' families, and the schooling of cadres' children..."

"Hey, what did I think? Isn't there a track in the factory? I gave the city compound a whole special car and installed a first-class cabin for airplanes. Then the cadres came to Shiliying to work in the morning and returned to Taishi to rest in the evening. Isn't this just Have all the problems been solved? And you can also observe the public sentiment while commuting.”

"That makes sense!"

Upon hearing this, the old director hung up the phone without hesitation and went straight to Tianwaiqiao Station.

other side.

With the arrival of the demolition team, farmers also built private houses in the city compound.

But Yu Yang's vision suddenly changed.

[You have occupied the control center of the entire area. ]
[You gain a level 1 town center. ]
Town Center:…

(End of chapter)

Previous Details Next