Chapter 52 Complaints
Yu Honghai is coming soon, which means that the purchased Fendt 930 and the complete set of Claas silage machinery are also coming.
Guo Yang was also a little anxious when he thought that there were still nearly 40,000 acres of hard work to improve the 200,000 acres of saline-alkali land.
The Haohe project management team headed by Lao Xiang and the construction team quarreled every day on the construction site, and the quarrel was intense.
The phone calls came to him every now and then, and they only complained.
Make him feel upset too!
Urgent indeed, today is already August 14th, and there are still at most twenty-five or six days before the set acceptance time of early September.
After deep plowing and drying, there are still processes such as rotary tillage, salt washing and salt discharge, sand covering, etc. waiting.
Looking at the 26 points of natural energy that the seed store had finally accumulated, Guo Yang was in a daze for a while.
After a long time, Guo Yang made a decision.
Stud!
Must stud
Use all natural energy in the transformation of agricultural machinery!
Give it a try and see if you can chew off the hard bones of these 40,000 acres in a few days.
Even if it didn’t succeed, there would be no regrets.
Moreover, natural energy is continuously accumulated and can be obtained uninterruptedly as the soil is continuously repaired.
After figuring it out, Guo Yang found the information on the giant hydraulic tilting plow of the German Leken Company collected in Hannover from the seed store.
Lecken is a German land preparation agricultural company with a history of more than 200 years. Its main products include hydraulic turning plows, power-driven harrows, combined soil preparation machines, seed drills, etc.
It is the world's top agricultural machinery supporting company.
The giant flip plow chosen by Guo Yang adopts a 12+8 structure, with a total of 30 plowshares mounted on the front and rear beams. The overall length is more than 15 meters, the total weight is more than 8 tons, and the maximum farming width is Reach 10 meters!
It is currently the largest semi-trailed turning plow in the world. The hydraulic system of the plow body can output up to 25 tons of turning force!
Subsequently, Guo Yang also put the long-lost Fendt 930 tractor into the analysis options.
"Ding, does it consume natural energy to analyze the Leken hydraulic tilting plow and Fendt 930 tractor? This analysis is expected to consume 12-16 points of natural energy."
"Yes."
“Ding, parsing...”
"Ding, it consumes 16 points of natural energy, +2 technical information, +2 mechanical fragments."
Seeing that 16 points of natural energy have been consumed, and +2 mechanical fragments, Guo Yang suddenly became a little nervous.
The last time I analyzed the two stone pickers, Conskel and Rotoveyer, they only consumed 10 points of natural energy. I didn’t expect it to increase so much this time.
The natural energy is probably not enough!
To maximize the potential of agricultural machinery, both mechanical fragment transformation and natural energy transformation must be used on agricultural machinery.
The combination of two sets of tractors + hydraulic turning plow requires 4 mechanical pieces.
So at least one tractor + flip plow combination must be analyzed, and the mechanical fragments must be ensured. This is another 16 points.
Add the consumption of natural energy to transform agricultural machinery, it is estimated that each unit is 2 points, and 2 sets is 8 points.
This is 40 points of natural energy.
The key is that Guoyang currently does not have the physical machinery of Layken’s giant flip plow!
Therefore, we can only find another way to use natural energy to stack plowshares on our own, and the number must not be small. According to Guo Yang's plan, the number of plowshares is at least more than that of Leken Company.
According to this situation, the superimposed plowshare must reserve at least 15 points of natural energy.
This is 55 points!
Oh my God!
After making an estimate, Guo Yang was immediately stunned.
There is still 29 points of natural energy left, such a big gap!
According to his calculations, it has only taken three or four days since the stone picker was modified to accumulate 19 points of energy.
When Yu Honghai arrives with the farm machinery, the transformation will take two days, and he will be able to accumulate about 10 points of natural energy.
If it really doesn’t work, we can still postpone it for a day or two, I guess I can make up for it no matter what.
But the analysis of the natural energy consumed by the hydraulic tilting plow and Fendt 930 exceeded his expectations, and there was a slight deviation in the calculation...
well!
Lao Xiang, Lao Xiang, I have no choice but to do it. Who told me that mathematics was given by the physical education teacher. Dial Xiang Tianshan.
“Master Xiang, let’s make some adjustments to the work plan on the project. First, we will focus on manpower, material resources, and machinery to attack the progress of salt washing, salt discharge, and sand covering.”
"The areas that have been covered with sand should also be rotary tilled and mixed thoroughly. If possible, you can also add some organic fertilizer in the next two days."
"The progress of the excavator's deep plowing of the sundeck can be slowed down a little, and the salt layer on the surface of the remaining part that has not been started should be scraped off first."
"The speed must be fast, fast! It's time to work overtime! If you need to pay, pay!”
“As for deep plowing and drying, leave it to me.”
Scraping off the surface salt layer, washing the salt, and covering it with sand are all ways to reduce the salinity. The most effective measure is also the only way Guo Yang can think of to increase the speed of natural energy acquisition.
As for how many acres of land should be improved to obtain 1 point of natural energy, Guo Yang really couldn't calculate it at the moment, and the physical education teacher didn't know advanced mathematics either.
A word from the boss can cause employees to lose their legs.
Xiang Tianshan reluctantly followed Guo Yang’s instructions and issued the latest instructions to the construction unit.
Jiuquan Longen and Jinta Qiangsheng hid behind everyone, complaining and complaining secretly.
Long Province Farmers started spraying on the spot.
As for Xinjiang Provincial Farm Reclamation, which was brought in by the Ministry of Agriculture, the person in charge, Hou Huaijie, directly attacked Party A.
"Lao Xiang, do you still dare to order Bilian? Look at what you have forced our brothers to do."
"Why can't you keep up with the progress? It's not the fault of this place, it's so hard, even if What’s the use of changing it? I can’t recoup the cost for five hundred years, so I won’t even give it to you!” , the driver is about to rebel. "
"Now we have to adjust again, TMD, we are just thinking about it all the time, and we are being treated like monkeys."
I think in my heart. Although he was a little angry, he still listened calmly and did not throw the blame on the boss. That didn't make much sense.
When you meet such a imaginative boss, if he doesn't take over, who else can take over?
The key is that Hou Huaijie only scolded him and did not dare to scold the boss.
Alas! You chose it yourself.
And if the construction party wants to get the money smoothly, it must still follow Algo's instructions.
After waiting for Huaijie to vent for a while, other construction units stepped forward to pull him.
"Mr. Xiang, are we not in a hurry to plant the remaining 30,000 acres of hardwood this year?"
"If you don't want to plant it, just say it earlier. Any engineering person with some discernment can see that, in two months It is simply unrealistic to convert 200,000 acres of severely saline-alkali land."
Hou Huaijie shouted again: "If you don't like planting, you won't be able to get the overtime pay and bonus incentives at all. "Little!"
Xiang Tianshan said at this time: "We still have to plant. As for deep plowing and drying, the boss said he would find a way."
Hearing this, Hou Huaijie and others did not. Dare to believe your ears.
There is no need for an excavator to dig deep, so what does he want to do? Two imported machines have a hammer!
Does he think he is Tu Xingsun?
……
Even if they were reluctant, several construction units moved the site in accordance with Lao Xiang’s latest requirements.
The progress of washing and discharging salt and covering sand with rotary tillage has suddenly improved a lot.
By the time Guo Yang saw Yu Honghai and Fendt 930, whom he had longed for, the natural energy had reached 56 o'clock.
Two days at 30 o'clock.
It seems that the construction unit still has potential that has not yet been explored!
Thank you all for your rewards, monthly votes, and recommendation votes, thank you! ! !
(End of this chapter)